2. In the next step, we will first check whether there is water leakage in the water pipe, and then gradually increase the pipe pressure. increase to the test pressure. Usually the test pressure of the cold water pipe is 1.5 times the design pressure, but not less than 0.9MPa; the test pressure of the hot water pipe is 2 times the design pressure, but not less than 1.2MPa. After stabilizing the pressure for 10 minutes, reduce the pressure to the design pressure and stop the pressure for 30 minutes. If there is no leakage in the water pipe and the pressure does not drop, it is qualified.
4. If the water pipe is hot-melt connected, the hydraulic test can only be carried out 24 hours after the pipe is installed and the appearance inspection is qualified. When you conduct a water pressure test, there must be no air in the water pipes, and inferior water meters cannot be used. If the pressure drops rapidly during the water pipe pressure measurement, it may be because the water pipe plug is not blocked properly.
Go here to learn more about " Seamless Steel Pipe for Fluid Transportation"